Job calculator
Chain-link fence calculator
Enter the length of the fence and how many corners it turns, then pick the height. The parts list follows a fence maker’s own planning guide.
Measurements
Example values. Replace them with yours.
Read as 100 ft 0 in
ft-in
None
Type it the way the tape reads: 10' 6-1/2", 126" or 3.2 m.
Buy list
100 ft 0 in of 4 ft chain link
- 2rollschain-link fabric, 4 ft high, 50 ft
- 10piecestop rail, 1-3/8 in, 10 ft 6 in
- 2terminal posts2-3/8 in, for a 4 ft fence
- 9line posts1-5/8 in, for a 4 ft fence
- 2tension bars4 ft
- 6tension bands2-3/8 in
- 2rail end bands2-3/8 in
- 2rail end cups1-3/8 in
- 8carriage bolts5/16 × 1-1/4 in
- 2terminal post caps2-3/8 in
- 9line post caps1-5/8 in
- 86tie wiresaluminum
- 10bags80 lb concrete mix
Estimate only, not engineering advice. Check local codes for requirements.
The working
- Fabric rolls, rounded up100 ft ÷ 50 ft per roll = 2 rolls
- Top rail, per 10 ft, rounded up100 ft ÷ 10 ft = 10 pieces
- Terminal posts2 ends + 0 corners = 2 posts
- Line posts, at most 10 ft apart1 run of 100 ft: (10 spaces) − 1 = 9 per run, 9 posts
- Tension bars2 ends × 1 + 0 corners × 2 = 2 bars
- Tension bands2 bars × (4 − 1) = 6 bands
- Rail end bands and cups1 each per tension bar = 2 of each
- Carriage bolts6 tension bands + 2 rail end bands = 8
- Tie wires9 line posts × 4 + 1,200 in ÷ 24 in of top rail = 86 ties
- Concrete in the holes2 × π × 4 in × 4 in × 30 in + 9 × π × 3 in × 3 in × 24 in = 5.28 cu ft
- Add 10% waste5.28 cu ft × 1.1 = 5.81 cu ft
- Concrete bags, rounded up5.81 cu ft ÷ 0.6 cu ft per bag = 9.68 → 10 bags
Assumptions and sources
| Figure | Used | Source | Pulled |
|---|---|---|---|
| Chain-link parts and how manyEvery count above except the concrete. | Per the guide | Merchants Metals, DIY Chain Link Fence Planning and Purchasing (2011) | 2026-11-17 |
| Post holesDeep end of each range. | Terminal 8 × 30 in, line 6 × 24 in | Hoover Fence Co., Eight Steps to Chain-Link Fence Installation | 2026-11-17 |
| Yield of one 80 lb bag | 0.6 cu ft | QUIKRETE Concrete Mix No. 1101 data sheet, revised October 2022 | 2026-11-16 |
| Waste allowanceCovers waste, over-excavation and other contingencies. | 10% | NRMCA Concrete in Practice CIP 8, Discrepancies in Yield | 2026-11-16 |